Sunday, December 27, 2009

The Five Year Plan

I suppose I should memorialize the five-year plan here. It will likely change as soon as I hit the "publish" button. This is the framework from within which we'll diligently work.

Pre-Move-in (which is now looking to be February, a topic for another post)
  • Electric overhaul
  • Complete interior repaint
  • Buy sofa for living room
  • Wall paper entrance hallway
  • New kitchen fan
  • Service and clean the furnace
  • Ikea dressers for upstairs (maybe some other cheap-o temporary closet fixes until we can do the remodel upstairs in about 3 years).
  • Ply-wood door in staircase (2b explained l8r)
2010 Projects
  • Bolt house to foundation
  • Furnish and complete the first floor office
  • Buy or make a coffee table for the living room
  • Get proper venting to the water heater
  • Waterproofer
  • Furniture for main floor guest room
  • Window coverings
  • Fix doming floor in entryway
  • Fix moldings throughout house
  • New interior and exterior doors in certain locations
  • Reinforce/lift and stabilize 2nd floor original extension
2011 Projects
  • Kitchen/dining/outer room remodel (new appliances, move sink, change walls)
  • Fix previously improperly installed windows in back of house
  • New washer/drier
2012 Projects
  • Hardwood floor in master bedroom
  • Cathedral ceilings upstairs and expose collar ties
  • Built-ins in knee walls upstairs as storage solution
  • Furnish top floor bedrooms
  • Remodel backyard/patio
2013 Project
  • Top floor bath complete remodel
2014 Project
  • Remodel all staircases