Pre-Move-in (which is now looking to be February, a topic for another post)
- Electric overhaul
- Complete interior repaint
- Buy sofa for living room
- Wall paper entrance hallway
- New kitchen fan
- Service and clean the furnace
- Ikea dressers for upstairs (maybe some other cheap-o temporary closet fixes until we can do the remodel upstairs in about 3 years).
- Ply-wood door in staircase (2b explained l8r)
- Bolt house to foundation
- Furnish and complete the first floor office
- Buy or make a coffee table for the living room
- Get proper venting to the water heater
- Waterproofer
- Furniture for main floor guest room
- Window coverings
- Fix doming floor in entryway
- Fix moldings throughout house
- New interior and exterior doors in certain locations
- Reinforce/lift and stabilize 2nd floor original extension
- Kitchen/dining/outer room remodel (new appliances, move sink, change walls)
- Fix previously improperly installed windows in back of house
- New washer/drier
- Hardwood floor in master bedroom
- Cathedral ceilings upstairs and expose collar ties
- Built-ins in knee walls upstairs as storage solution
- Furnish top floor bedrooms
- Remodel backyard/patio
- Top floor bath complete remodel
- Remodel all staircases